| Home

Overview


Original Research

ANALYSIS OF THE FACTORS CAUSING DELAYS IN CONSTRUCTION PROJECT IMPLEMENTATION, CASE STUDY: AMMONIUM NITRATE PROJECT 75000 MTPY AMMONIUM NITRATE & 60000 MTPY NITRIC ACID PLANT IN INDUSTRIAL PLANT COMPANIES IN INDONESIA

AMINULLAH 1, and TUKHAS SHILUL IMAROH 2.

Vol 18, No 01 ( 2023 )   |  DOI: 10.17605/OSF.IO/CG2EA   |   Author Affiliation: Master of Management, Universitas Mercu Buana, Indonesia 1; Master of Management Economy and Business Faculty, Mercu Buana University, Indonesia 2.   |   Licensing: CC 4.0   |   Pg no: 2247-2260   |   Published on: 31-01-2023

Abstract

The purpose of this research is to find out the factors that cause delays/delays in the Indonesian Industrial Plant Company Project and to find out the anticipatory efforts so that the same incident does not happen again in the future. The population in this study are all construction projects undertaken by EPC Service Companies. The sample in this study is the Indonesian Industrial Plant Company project. This research was conducted using quantitative methods. This method is needed to know the classification of actions that must be carried out afterwards. Data Processing with the Prospective Time Impact Analysis Method. The research results prove that the factors causing delays in the EPCC Indonesian Industrial Plant Company project are engineering low productivity. In terms of scope of work, engineering delays that occur are the result of delays in the engineering scope carried out by the ENGINEERING COMPANY, which have an impact on the procurement and construction and completion of the project. Means in this case the ENGINEERING COMPANY is the party responsible for project delays.


Keywords

Factors causing delay and Project Performance/Performance Index